roadtorque-alt

Heavy rain has de-stabilised the large slips, meaning it is now unsafe for our contractors to continue clearing work through SH2 Waioweka Gorge.
With weather ...

Positive business signals
The latest NZIER Quarterly Survey of Business Opinion (QSBO) showed a strong lift in business confidence in the fin...

New Zealand’s fairest fuel providers plan to create a national network that would continue to drive lower pump prices to Kiwis everywhere.
The merger would co...

Engineers at Purdue University have successfully demonstrated the first U.S. roadway capable of wirelessly charging a heavy-duty electric truck while it travels at highwa...
Preparation work for in-road scales as part of Napier’s Commercial Safety Vehicle Centre rescheduled

Work to prepare for the installation of in-road scales on State Highway 2 Hawke’s Bay Expressway has been rescheduled.
The in-road scales, set to be installed on SH...

NZ Transport Agency Waka Kotahi (NZTA) is urging drivers to be prepared for overnight road closures next week as resurfacing work continues on SH1 Ngauranga Gorge. These ...
- Prev
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- 78
- 79
- 80
- 81
- 82
- 83
- 84
- 85
- 86
- 87
- 88
- 89
- 90
- 91
- 92
- 93
- 94
- 95
- 96
- 97
- 98
- 99
- 100
- 101
- 102
- 103
- 104
- 105
- 106
- 107
- 108
- 109
- 110
- 111
- 112
- 113
- 114
- 115
- 116
- 117
- 118
- 119
- 120
- 121
- 122
- 123
- 124
- 125
- 126
- 127
- 128
- 129
- 130
- 131
- 132
- 133
- 134
- 135
- Next

+ EQUIPMENT GUIDE - FREE
