Harbour Bridge Lane Closures For Resurfacing This Weekend
Posted: 20-Feb-2025 |


NZ Transport Agency Waka Kotahi (NZTA) advises resurfacing work will take place on southbound lanes 1 & 2 (clip-on lanes) of the Auckland Harbour Bridge this weekend.

This will require longer than a typical overnight closure due to the nature of the material used to pave the bridge. Southbound lanes 1 & 2 (clip-on lanes) will be closed from 9pm Saturday 22 February until 12pm Sunday 23 February while this work is carried out. Shelly Beach southbound off-ramp will also be closed.

Traffic will still be able to cross the bridge in both directions at all times during the works. 

We recommend using State Highway 16 Western Ring Route where possible to avoid congestion. The route carries traffic between SH1 Constellation Drive and SH1 Manukau using State Highway 18, SH16 and State Highway 20. 

This work has been scheduled on a weekend to avoid disrupting peak travel times during the week.


Search Articles

NZ Truck & Driver Magazine
Read Now